drag scheduling
This commit is contained in:
@@ -10,8 +10,10 @@ This file is the running release and change log for CODEXIUM. Keep it updated wh
|
||||
- Planning workbench replacing the old one-note planning screen with mode switching, dense exception rail, heatmap load view, agenda view, and focus drawer
|
||||
- Planning workbench dispatch upgrade with station load summaries, readiness scoring, release-ready and blocker filters, richer planner rows, and inline release/build/buy actions
|
||||
- Manufacturing finite-capacity slice with station daily capacity, parallel capacity, working-day calendars, calendar-aware operation scheduling, and operation-level rescheduling from the work-order detail page
|
||||
- Manufacturing station edit support for working days, active state, queue, and capacity settings directly from the manufacturing screen
|
||||
- Workbench rebalance controls for operation rows, including planner-side datetime rescheduling, quick shift moves, and heatmap-day targeting without leaving the dispatch surface
|
||||
- Workbench station-to-station rebalance so planners can move an operation onto another active work center and rebuild the downstream chain from the same dispatch surface
|
||||
- Workbench drag scheduling in station grouping mode, with draggable operation cards, station drop targets, heatmap-day-aware drop timing, and projected post-drop load cues before the move is committed
|
||||
- Project milestones with status, due dates, notes, and edit-time sequencing inside the project workflow
|
||||
- Project-side milestone and work-order rollups surfaced on project list and detail pages
|
||||
- Inventory SKU master builder with family-level sequence codes, branch-aware taxonomy management, and generated SKU previews on the item form
|
||||
|
||||
Reference in New Issue
Block a user