This commit is contained in:
2026-03-18 06:39:38 -05:00
parent c49ed4bf4a
commit e00639bb8b
11 changed files with 488 additions and 4 deletions

View File

@@ -12,6 +12,7 @@ This file is the running release and change log for CODEXIUM. Keep it updated wh
- Manufacturing finite-capacity slice with station daily capacity, parallel capacity, working-day calendars, calendar-aware operation scheduling, and operation-level rescheduling from the work-order detail page
- Manufacturing station edit support for working days, active state, queue, and capacity settings directly from the manufacturing screen
- Operation execution controls on work orders, including start/pause/resume/complete actions, labor posting, and actual-minute rollups by operation and work order
- Operation operator assignment and timer-based labor capture, with timer stop posting elapsed minutes back as labor entries
- Workbench rebalance controls for operation rows, including planner-side datetime rescheduling, quick shift moves, and heatmap-day targeting without leaving the dispatch surface
- Workbench station-to-station rebalance so planners can move an operation onto another active work center and rebuild the downstream chain from the same dispatch surface
- Workbench drag scheduling in station grouping mode, with draggable operation cards, station drop targets, heatmap-day-aware drop timing, and projected post-drop load cues before the move is committed